Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    B-Roll: Drone and Time Lapse Footage of Charleroi Empty Navigation Chamber

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    PITTSBURGH, PA, UNITED STATES

    05.25.2023

    Video by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    B-Roll and time lapse video of the final stage of construction and chamber refill of the new navigation lock constructed at the Charleroi Locks and Dam on the Monongahela River, operated by the U.S. Army Corps of Engineers Pittsburgh District, shot in April through late May 2023.

    The U.S. Army Corps of Engineers Pittsburgh District began to refill the newly constructed lock chamber with water at the Monongahela River Locks and Dam 4 in Charleroi, Pennsylvania, May 25, 2023. The chamber took several days to fill with approximately 18.5 million gallons of water. Once filled, the Pittsburgh District will move forward with installing the miter gates and testing out the lock for navigation. The new lock is expected to go into operation in 2024. The construction project at Charleroi is part of the Lower Mon Project, sometimes referred to as a "mega project" because of its size and scope.

    (U.S. Army Corps of Engineers Pittsburgh District video by Michel Sauret & Huan Tran)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.25.2023
    Date Posted: 10.16.2023 08:33
    Category: B-Roll
    Video ID: 900515
    VIRIN: 230525-O-TI382-2793
    Filename: DOD_109940370
    Length: 00:03:56
    Location: PITTSBURGH, PA, US

    Video Analytics


    Downloads: 8
    High-Res. Downloads: 8

    PUBLIC DOMAIN