Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    B-Roll: Lock chamber at Charleroi begins to fill back with water

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    PITTSBURGH, PA, UNITED STATES

    05.25.2023

    Video by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    B-Roll package of the U.S. Army Corps of Engineers Pittsburgh District refilling the newly constructed lock chamber with water at the Monongahela River Locks and Dam 4 in Charleroi, Pennsylvania, late May 2023. The chamber will take several days to fill with approximately 18.5 million gallons of water. Once filled, the Pittsburgh District will move forward with installing the miter gates and testing out the lock for navigation. The new lock is expected to go into operation in 2024. The construction project at Charleroi is part of the Lower Mon Project, sometimes referred to as a "mega project" because of its size and scope. (U.S. Army Corps of Engineers Pittsburgh District video by Michel Sauret)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.25.2023
    Date Posted: 10.16.2023 07:34
    Category: B-Roll
    Video ID: 900512
    VIRIN: 230525-A-TI382-6987
    Filename: DOD_109940348
    Length: 00:10:39
    Location: PITTSBURGH, PA, US

    Video Analytics


    Downloads: 8
    High-Res. Downloads: 8

    PUBLIC DOMAIN