Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    47th Civil Engineering Squadron Installation Management Flight

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    LAUGHLIN AIR FORCE BASE, TX, UNITED STATES

    01.06.2023

    Video by Airman Kailee Reynolds 

    47th Flying Training Wing

    Ramone Flores, 47th Civil Engineering Squadron Installation Management Flight chief, speaks about the responsibilities of his flight at Laughlin Air Force Base, Texas, Jan. 6, 2023. Flores demonstrated how the Installation Management Flight provides Laughlin AFB safe and comfortable housing and dormitories. (U.S. Air Force video by Airman 1st Class Kailee Reynolds)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 01.06.2023
    Date Posted: 05.31.2023 09:59
    Category: Package
    Video ID: 883534
    VIRIN: 230106-F-SC207-1020
    Filename: DOD_109640744
    Length: 00:01:00
    Location: LAUGHLIN AIR FORCE BASE, TX, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN