Member of the 5th Civil Engineer Squadron remove snow from affected areas at Minot Air Force, North Dakota, on Jan. 1, 2022. 5 CES is the first to base when the going gets tough. It's because of their hard work that Minot Air Force Base can maintain mission capabilities even in a blizzard. (U.S. Air Force video by Airman 1st Class Alexander Nottingham)
Date Taken: | 01.01.2023 |
Date Posted: | 02.01.2023 08:21 |
Category: | Package |
Video ID: | 870272 |
VIRIN: | 221214-F-EQ797-1001 |
Filename: | DOD_109398498 |
Length: | 00:00:37 |
Location: | MINOT AIR FORCE BASE, ND, US |
Downloads: | 2 |
High-Res. Downloads: | 2 |
This work, Snow Job is Too Big For CE, by A1C Alexander Nottingham, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT