Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Cannelton Locks and Dam miter gate replacement project

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    CANNELTON, INDIANA, UNITED STATES

    11.08.2022

    Video by Charles Delano 

    U.S. Army Corps of Engineers, Louisville District

    U.S. Army Corps of Engineers Louisville District Project Engineer Josh Saylor provides an update on the miter gate replacement project at Cannelton Locks and Dam in Cannelton, Indiana.

    Due to scheduled maintenance and repairs, the 1,200-foot primary chamber has been closed since July, to allow replacement of the miter gates and related equipment on each end of the primary chamber to increase reliability and efficiency on the inland waterways system.

    VIDEO INFO

    Date Taken: 11.08.2022
    Date Posted: 11.10.2022 13:44
    Category: Interviews
    Video ID: 863971
    VIRIN: 221108-A-PA223-308
    Filename: DOD_109318163
    Length: 00:00:52
    Location: CANNELTON, INDIANA, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN