Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Fort McCoy Central Issue Facility forklift operations

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Forklift operations at the Fort McCoy Central Issue Facility (CIF) are shown Oct. 27, 2022, at Fort McCoy, Wis. The facility (building 780) was built at a cost of more than $9 million. Central Issue Facility personnel began operations at the building Sept. 14, 2015. Operating out of a 62,548-square-foot facility in building 780, CIF personnel have plenty of space to store equipment and support customers. Since 2011, the Fort McCoy CIF has been issuing Reserve Soldiers their entire Organizational Clothing and Individual Equipment needs. (U.S. Army Video by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)

    VIDEO INFO

    Date Taken: 10.27.2022
    Date Posted: 11.01.2022 00:22
    Category: B-Roll
    Video ID: 862654
    VIRIN: 221027-A-OK556-332
    Filename: DOD_109297419
    Length: 00:00:39
    Location: FORT MCCOY, WISCONSIN, US

    Video Analytics


    Downloads: 12
    High-Res. Downloads: 12

    PUBLIC DOMAIN