Forklift operations at the Fort McCoy Central Issue Facility (CIF) are shown Oct. 27, 2022, at Fort McCoy, Wis. The facility (building 780) was built at a cost of more than $9 million. Central Issue Facility personnel began operations at the building Sept. 14, 2015. Operating out of a 62,548-square-foot facility in building 780, CIF personnel have plenty of space to store equipment and support customers. Since 2011, the Fort McCoy CIF has been issuing Reserve Soldiers their entire Organizational Clothing and Individual Equipment needs. (U.S. Army Video by Scott T. Sturkol, Public Affairs Office, Fort McCoy, Wis.)
Date Taken: | 10.27.2022 |
Date Posted: | 11.01.2022 00:22 |
Category: | B-Roll |
Video ID: | 862654 |
VIRIN: | 221027-A-OK556-332 |
Filename: | DOD_109297419 |
Length: | 00:00:39 |
Location: | FORT MCCOY, WISCONSIN, US |
Downloads: | 12 |
High-Res. Downloads: | 12 |
This work, Fort McCoy Central Issue Facility forklift operations, by Scott Sturkol, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.