AIEA, Hawaii (Jan. 14, 2022) - Pipes waiting for installation at the Red Hill Well Shaft. The Interagency Drinking Water System Team is a joint initiative where the U.S. Navy is working closely with the Hawaii Department of Health, U.S. Environmental Protection Agency and the U.S. Army to restore safe drinking water to Joint Base Pearl Harbor-Hickam housing communities through sampling and flushing. For detailed information, go to: www.navy.mil/jointbasewater. (U.S. Navy Video by Mass Communication Specialist 3rd Class Jeremy Lemmon)
Date Taken: | 01.14.2022 |
Date Posted: | 01.23.2022 16:22 |
Category: | B-Roll |
Video ID: | 828987 |
VIRIN: | 220114-N-LP387-1002 |
Filename: | DOD_108775899 |
Length: | 00:00:23 |
Location: | HONOLULU, HAWAII, US |
Downloads: | 10 |
High-Res. Downloads: | 10 |
This work, U.S. Navy Pipes Awaiting Installation, by PO2 Jeremy Lemmon, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.