This video depicts ongoing modernization of Building 1-C at Tobyhanna Army Depot. Over $900M have been made at TYAD to posture the installation for future capability development, support Large Scale Combat Operations, as well as surge requirements.
| Date Taken: | 11.30.2021 |
| Date Posted: | 11.30.2021 15:10 |
| Category: | B-Roll |
| Video ID: | 823363 |
| VIRIN: | 211130-A-TB732-0001 |
| Filename: | DOD_108705710 |
| Length: | 00:01:05 |
| Location: | US |
| Downloads: | 5 |
| High-Res. Downloads: | 5 |
This work, Tobyhanna Army Depot Modernization, by Ryan Beilman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.