Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    B-Roll: Pittsburgh District Safety Buoys Install Allegheny River

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    PITTSBURGH, PA, UNITED STATES

    06.21.2021

    Video by Michel Sauret    

    U.S. Army Corps of Engineers Pittsburgh District

    B-Roll video package. The U.S. Army Corps of Engineers Pittsburgh District installed horizontal safety buoys to increase safety at the Allegheny River Lock and Dam 2 in Pittsburgh, Pennsylvania, June 10, 2021. The Pittsburgh District recently added several horizontal buoys on the Allegheny and at the Dashields Lock and Dam on the Ohio River to provide even more visible warning for recreational boaters to prevent them from going over the dam. The dams on the Allegheny River and at Dashields are submerged, also known as fixed crest dams, which make them difficult to see from upstream. (U.S. Army Corps of Engineers Pittsburgh District video by Michel Sauret)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 06.21.2021
    Date Posted: 09.15.2021 16:38
    Category: B-Roll
    Video ID: 813921
    VIRIN: 210621-A-TI382-849
    Filename: DOD_108571227
    Length: 00:03:29
    Location: PITTSBURGH, PA, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN