Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Yuma 10/27 Make Safe work

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    YUMA, AZ, UNITED STATES

    07.22.2021

    Video by Robert DeDeaux 

    U.S. Army Corps of Engineers, South Pacific Division

    U.S. Army Corps of Engineers South Pacific Border District contractors conduct make safe work at the Yuma 10/27 former wall construction site near Yuma, Arizona, July 21 - 22. The District began safety work on July 15 at the Yuma 2 and Yuma 10/27 former wall construction sites in the U.S. Border Patrol’s Yuma sector. This work will not involve expanding the border barrier and specific activities will include filling open trenches, cutting and capping conduit, making gate foundations safe, making maintenance roads safe, and grading around handholds and manholes. (No one in this photo crossed the international border.)

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 07.22.2021
    Date Posted: 08.12.2021 17:26
    Category: B-Roll
    Video ID: 808450
    VIRIN: 210722-A-RY318-905
    Filename: DOD_108480656
    Length: 00:00:32
    Location: YUMA, AZ, US

    Video Analytics


    Downloads: 12
    High-Res. Downloads: 12

    PUBLIC DOMAIN