Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Great Sodus Bay seawall repair UPDATE

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Victoria Towndrow, USACE Buffalo civil engineer, gives an update on our repair project at Sodus Point, NY. We're fixing 525 feet of the Great Sodus Bay east breakwater and this structure provides protection along the southern shoreline of Lake Ontario.

    Erosion of the north face of the Charles Point shoreline protection structure is due to waves overtopping the steel sheet pile during high water and storm periods. This overtopping has caused erosion of the bluff which is jeopardizing the south end of the federal structure and the stability of the seasonal residences located near the edge of the bluff.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 04.13.2021
    Date Posted: 04.20.2021 18:31
    Category: B-Roll
    Video ID: 791496
    VIRIN: 210413-A-PG036-321
    Filename: DOD_108293873
    Length: 00:01:09
    Location: US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN