Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Broll Miami Beach Convention Center Conversion April 08, 2020

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    MIAMI BEACH, FL, UNITED STATES

    04.08.2020

    Video by Brigida Sanchez 

    U.S. Army Corps of Engineers, Jacksonville District

    The Miami Beach Convention Center is now a 24-hour construction site crews work at a steady pace to install ICU and Acute Care pods. USACE staff awarded a construction contract Monday, April 6, 2020, for $22.5 Million to Robins & Morton of Miami, Fla. to convert the Miami Beach Convention Center into a 450-bed hospital.

    Broll of the press conference, governor, and Chief of Engineers, Lt. Gen. Semonite

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 04.08.2020
    Date Posted: 04.14.2020 16:08
    Category: B-Roll
    Video ID: 747448
    VIRIN: 200408-A-AZ289-4003
    Filename: DOD_107769156
    Length: 00:02:13
    Location: MIAMI BEACH, FL, US
    Hometown: MIAMI, FL, US

    Video Analytics


    Downloads: 8
    High-Res. Downloads: 8

    PUBLIC DOMAIN