U.S. Army Corps of Engineers South Pacific Border District contractor using an excavator moves panels to the barrier installation site along the U.S.-Mexico border near Yuma, Arizona, March 26. USACE is providing direction and oversight for Department of Defense-funded construction of border barrier projects from California to Texas. These projects are being executed by USACE, as directed through the U.S. Army by the Secretary of Defense, in response to the Presidential national emergency declaration dated Feb. 15, 2019, requiring the use of the armed forces and authorizing the use of Section 2808 of Title 10, U.S. Code.
Date Taken: | 03.26.2020 |
Date Posted: | 04.01.2020 17:47 |
Category: | B-Roll |
Video ID: | 745187 |
VIRIN: | 200326-D-NJ924-663 |
PIN: | 1412 |
Filename: | DOD_107749875 |
Length: | 00:00:31 |
Location: | YUMA, ARIZONA, US |
Downloads: | 36 |
High-Res. Downloads: | 36 |
This work, South Pacific Border District contractor moves panels to border location, by Jay Woods, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.