Various shots of a retaining wall being constructed. Shots include: Lifting and positioning large cement blocks into place, moving and positioning soil, and monument marker. The El Centro 1 project spans fifteen miles, near Calexico, CA, January 23, 2020. The U.S. Army Corps of Engineers, South Pacific Border District is providing contracting services, including design and construction oversight, of Department of Defense-funded Southwest border barrier projects in California, Arizona, New Mexico and Texas at the direction of the Administration and at the request of Department of Homeland Security, Customs and Border Protection. (no one in this image crossed the international border)
Date Taken: | 01.23.2020 |
Date Posted: | 01.29.2020 13:49 |
Category: | B-Roll |
Video ID: | 735926 |
VIRIN: | 200123-A-ET715-597 |
Filename: | DOD_107610254 |
Length: | 00:07:28 |
Location: | CALEXICO, CA, US |
Downloads: | 17 |
High-Res. Downloads: | 17 |
This work, Border Barrier (El Centro 1) Retaining Wall, by Jeremy Bell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT