The U.S. Army Corps of Engineers, Buffalo District has completed temporary measures to secure the west pier at Little Sodus Harbor, located in Fair Haven, New York on August 1, 2019.
Date Taken: | 08.06.2019 |
Date Posted: | 08.06.2019 14:16 |
Category: | Video Productions |
Video ID: | 701395 |
VIRIN: | 190806-A-YS819-002 |
Filename: | DOD_107092084 |
Length: | 00:00:29 |
Location: | FAIR HAVEN, NY, US |
Downloads: | 1 |
High-Res. Downloads: | 1 |
This work, Little Sodus Harbor West Pier Temporary Construction Complete, by Shaina Souder, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT