Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Heavy Equipment at Upper Margarita

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Heavy equipment machinery is used to remove the temporary sheet pile and earthen plug placed during the construction of the Upper Margarita concrete channel. The temporary measure was used to divert the water from Margarita Channel in order to perform the construction operations safely under dry conditions. The completion of this project will contribute to the flood mitigation on Margarita Channel and surrounding areas. Approximately 60 percent of the sheet pile and earthen plug has been removed to date. May 2, 2019

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 05.02.2019
    Date Posted: 05.29.2019 09:33
    Category: B-Roll
    Video ID: 683593
    VIRIN: 190502-A-LI123-1001
    Filename: DOD_106808269
    Length: 00:03:37
    Location: SAN JUAN, PR

    Video Analytics


    Downloads: 3
    High-Res. Downloads: 3

    PUBLIC DOMAIN