Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Releasing Water From Greers Ferry Dam

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    AR, UNITED STATES

    11.14.2018

    Video by Jay Woods 

    U.S. Army Corps of Engineers, Little Rock District

    HEBER SPRINGS, Ark. – The Army Corps of Engineers, Little Rock District will begin a spillway release from Greers Ferry Dam Wednesday.
    Three gates will be opened one-foot and one gate will be opened one-half foot resulting in a spillway release of about 2,500 cubic feet per second. Combined with the 24-hour hydropower release from two units, the total release will be 8,600 c.f.s.
    For more information call the Greers Ferry Project office at 501-362-2416, or stop by the office near the dam on Highway 25, three miles north of Heber Springs.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 11.14.2018
    Date Posted: 11.14.2018 15:21
    Category: B-Roll
    Video ID: 640348
    VIRIN: 181114-A-NJ924-1001
    Filename: DOD_106215694
    Length: 00:00:16
    Location: AR, US

    Video Analytics


    Downloads: 8
    High-Res. Downloads: 8

    PUBLIC DOMAIN