Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    AH-64 Apache Helicopter 500 Hours Phase Maintenance, at Katterbach Army Airfield in Ansbach, Bavaria, Germany

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    KATTERBACH, BAYERN, GERMANY

    01.26.2018

    Video by Charles Rosemond 

    Training Support Activity Europe           

    Soldiers of 1st Battalion, 3rd Aviation Regiment (Attack Reconnaissance) installs an AH-64 Apache helicopter main rotor head during 500 hours phase maintenance at Katterbach Army Airfield, Germany, Jan. 26, 2018. Phase maintenance inspections occur at regular intervals on all aircraft in order to keep them operational. (U.S. Army video by Charles Rosemond)

    VIDEO INFO

    Date Taken: 01.26.2018
    Date Posted: 02.06.2018 07:14
    Category: B-Roll
    Video ID: 583305
    VIRIN: 180126-A-IY962-050
    Filename: DOD_105296448
    Length: 00:02:31
    Location: KATTERBACH, BAYERN, DE

    Video Analytics


    Downloads: 73
    High-Res. Downloads: 73

    PUBLIC DOMAIN