U.S. Army Corps of Engineers employees explain the install of a 30 MW generator in Yabucoa, Puerto Rico to help restore the island's power grid. USACE was tasked by FEMA to work towards restoring the island's power grid after Class 5 Hurricane Maria made landfall and destroyed much of the island's power grid.
| Date Taken: | 11.30.2017 |
| Date Posted: | 12.08.2017 13:05 |
| Category: | Package |
| Video ID: | 571538 |
| VIRIN: | 171130-A-BN725-476 |
| Filename: | DOD_105153746 |
| Length: | 00:01:32 |
| Location: | YABUCOA, PR |
| Downloads: | 10 |
| High-Res. Downloads: | 10 |
This work, U.S. Army Corps of Engineers install a generator in Yabucoa, Puerto Rico, by MAJ Ryan Hignight, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.