Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Hurricane Maria: Spillway Solutions

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Working in conjunction with the Puerto Rico Electric Power Association, the U.S. Army Corps of Engineers is installing pumps at Guajataca Dam, that will allow repairs to the spillway damaged by hurricane Maria to continue, while also providing water to the treatment plants downstream which will serve as a source of clean, safe drinking water for tens of thousands of residents.

    VIDEO INFO

    Date Taken: 11.02.2017
    Date Posted: 11.03.2017 11:58
    Category: Package
    Video ID: 562562
    VIRIN: 171102-A-VX653-114
    Filename: DOD_105041945
    Length: 00:02:01
    Location: PR

    Video Analytics


    Downloads: 15
    High-Res. Downloads: 15

    PUBLIC DOMAIN