Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Wall Prototype Construction 10/10/17

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    Construction crews continue building prototype models of the proposed wall along the Southwest border between the United States and Mexico. The construction site is located near the Otay Mesa Port of Entry in San Diego, CA.
    Date taken: October 10, 2017

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 10.10.2017
    Date Posted: 10.13.2017 00:18
    Category: B-Roll
    Video ID: 557969
    VIRIN: 171010-A-CC123-001-CC
    Filename: DOD_104956592
    Length: 00:03:34
    Location: CA, US

    Video Analytics


    Downloads: 69
    High-Res. Downloads: 69

    PUBLIC DOMAIN