For 12 weeks, contractors worked around-the-clock, using dredges to suck up sand from the bottom of the Chesapeake Bay in the Norfolk, Virginia neighborhoods of Willoughby Spit, East Ocean View and Ocean View. The effort was done to raise and widen the beach to protect infrastructure in this portion of the city.
Date Taken: | 05.19.2017 |
Date Posted: | 06.02.2017 13:24 |
Category: | Package |
Video ID: | 529060 |
VIRIN: | 170602-A-OI229-101 |
Filename: | DOD_104439271 |
Length: | 00:02:23 |
Location: | NORFOLK, VIRGINIA, US |
Downloads: | 17 |
High-Res. Downloads: | 17 |
This work, Willoughby and Vicinity Storm Damage Reduction Project Complete, by Patrick Bloodgood, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.