170601-N-XU135-0001
Footage of Pre-Commissioning Unit Gerald R. Ford (CVN 78) during construction leading up to delivery to the U.S. Navy. Ford was formally accepted by the Navy on May 31, 2017, marking a major milestone for the first-in-class carrier.
| Date Taken: | 06.01.2017 |
| Date Posted: | 06.02.2017 10:12 |
| Category: | Package |
| Video ID: | 529049 |
| VIRIN: | 170601-N-XU135-0001 |
| Filename: | DOD_104438783 |
| Length: | 00:02:17 |
| Location: | US |
| Downloads: | 97 |
| High-Res. Downloads: | 97 |
This work, From Drydock to Delivery, by PO1 Kristopher Ruiz, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.