Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Savannah harbor deepening begins: Welcome aboard the Dredge Alaska

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    SAVANNAH, GA, UNITED STATES

    09.11.2015

    Video by Jeremy Buddemeier  

    U.S. Army Corps of Engineers, Savannah District

    As part of the Savannah Harbor Expansion Project, dredging for the outer harbor began Sept. 10 onboard the cutter head dredge Alaska. The vessel is situated approximately four miles offshore from Tybee Island in the entrance channel to Savannah harbor.

    Alaska's three-section crew will work around the clock until a pair of hopper dredges, which are more mobile and efficient, begin dredging in December because of restrictions due to the local turtle population.

    As the cutter head dredges, material moves up through the ladder pump to the main pump. The main pump pushes dredged material off the cutter head dredge through floating pipes to a spider barge, which disperses the material into scow vessels.

    Tugboats move scow vessels laden with dredged material to an EPA-designated disposal site, where the material is released. The tugboat then returns the empty scow vessel to the slot next to the spider barge, where it is filled with more dredged material.

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 09.11.2015
    Date Posted: 09.18.2015 11:19
    Category: B-Roll
    Video ID: 424383
    VIRIN: 150911-A-CE999-001
    Filename: DOD_102740976
    Length: 00:03:30
    Location: SAVANNAH, GA, US

    Video Analytics


    Downloads: 9
    High-Res. Downloads: 9

    PUBLIC DOMAIN