The Trident Modular Causeway Pier is about a third of a mile long, with about two dozen service members on board working to maintain, reconfigure and steer it. They face challenges, such as tidal changes through each 24 hour period in excess of 20ft.
Date Taken: | 07.10.2015 |
Date Posted: | 07.16.2015 02:50 |
Category: | Newscasts |
Video ID: | 415202 |
Filename: | DOD_102598802 |
Length: | 00:01:59 |
Location: | KR |
Downloads: | 1 |
High-Res. Downloads: | 1 |
This work, AFN Korea Update:, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT