Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    NSA Bahrain Bridge Move Timelapse

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    A tied arch bridge, known as the flyover bridge, was moved into place over the Khalifa Bin Salman Causeway connecting Naval Support Activity (NSA) Bahrain to the U.S. Navy port facility (NSA II). The 122.5 meter long, 21.4 meter high, 2650 metric ton bridge was constructed on NSA II, and will be driven across the causeway on self-propelled modular trailers (SPMT), and set in place on pre-constructed abutments. The greatest benefit of this process allows Bahrain traffic to be disrupted for hours as opposed to months it would have taken to build the bridge in place. This time lapse video is comprised of clips beginning at approximately 8:00 a.m, Jan. 29 and ending at 8:30 a.m., Jan. 31. (U.S. Navy video by Mass Communication Specialist 1st Class Steve Smith/Released) Also available in high definition

    LEAVE A COMMENT

    VIDEO INFO

    Date Taken: 01.31.2014
    Date Posted: 02.05.2014 09:35
    Category: B-Roll
    Video ID: 320924
    VIRIN: 140131-N-ZI300-001
    Filename: DOD_101105230
    Length: 00:03:50
    Location: BH

    Video Analytics


    Downloads: 13
    High-Res. Downloads: 13

    PUBLIC DOMAIN