A crew of volunteers scrape barnacles off the large lock's culverts at the Hiram M. Chittenden Locks, Nov. 16, 2026, Seattle, Washington. These two culverts are 800 feet long, 8 feet wide and 14 feet tall, running the entire length of the large lock.
The Hiram M. Chittenden Locks' large lock is dewatered and closed for maintenance from Nov. 2 - Nov. 20, 2026. Dewatering and maintenance occur approximately once a year for each lock. This annual maintenance is driven by the harsh conditions of machinery in saltwater. The U.S. Army Corps of Engineers, Seattle District is currently overseeing multiple maintenance projects within the Hiram M. Chittenden Locks' large lock chamber. The projects include: anode replacement, barnacle scraping, miter gate instrumentation, concrete repairs and hydraulic cylinder replacement.
The large lock is expected to reopen on Nov. 20. In the meantime, the small lock is currently open to boating traffic and pedestrians can still cross the locks.
The Hiram M. Chittenden Locks are over 100 years old and require yearly maintenance to ensure this piece of critical infrastructure remains safe and operational for commercial and recreational boating for years to come. In 2025, approximately 27,000 vessels passed through the locks. Additionally, the locks see over 2 million visitors a year.
(U.S. Army video by Abigail Chipps)
| Date Taken: | 11.16.2026 |
| Date Posted: | 11.20.2026 20:32 |
| Category: | Video Productions |
| Video ID: | 1030625 |
| VIRIN: | 261116-A-VU474-2002 |
| Filename: | DOD_112164702 |
| Length: | 00:01:07 |
| Location: | SEATTLE, WASHINGTON, US |
| Downloads: | 3 |
| High-Res. Downloads: | 3 |
This work, Sounds of Barnacle Scraping (ASMR), by Abigail Chipps, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.