U.S. Army Soldiers assigned to the Installation Reception Detachment, Headquarters and Headquarters Battalion, III Armored Corps, conduct a company run, Oct. 23, 2026, on Fort Hood, Tx. The unit conducts physical training events such as these for in-processing Soldiers to familiarize incoming personnel with the installation and maintain Soldiers' physical readiness during this period of transition. (U.S. Army video by Sgt. Nathan Morse)
| Date Taken: | 10.23.2026 |
| Date Posted: | 11.02.2026 09:08 |
| Category: | Video Productions |
| Video ID: | 1028160 |
| VIRIN: | 261023-A-YK151-9894 |
| Filename: | DOD_112110957 |
| Length: | 00:00:50 |
| Location: | FORT HOOD, TEXAS, US |
| Downloads: | 2 |
| High-Res. Downloads: | 2 |
This work, Installation Reception Detachment Conducts Physical Training for In-Processing Soldiers, by PFC Anthony Heatley and SPC Nathan Morse, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.