U.S. Army Corps of Engineers, Buffalo District Project Engineer Andrew Kist explains ongoing maintenance dredging operations in the Buffalo Harbor federal navigation channel in Buffalo, New York, Aug. 4, 2026. The approximately $2.3 million project removes accumulated sediment from Buffalo Harbor and the Buffalo River to maintain authorized channel depths, support safe navigation and keep the waterways accessible for commercial and recreational vessels. (U.S. Army video by Kaylee Wendt)
| Date Taken: | 08.04.2026 |
| Date Posted: | 08.13.2026 15:18 |
| Category: | Video Productions |
| Video ID: | 1018670 |
| VIRIN: | 260804-A-FB511-6973 |
| Filename: | DOD_111902876 |
| Length: | 00:01:08 |
| Location: | BUFFALO, NEW YORK, US |
| Downloads: | 0 |
| High-Res. Downloads: | 0 |
This work, Moving Sediment and Maintaining Navigation in the Buffalo Harbor, by Kaylee Wendt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.