A functional spillway flow test was conducted at the Garrison Dam in late June marking a first for the Garrison Dam Safety Modification Project. Engineers with the U.S. Army Corps of Engineers, Omaha District conducted the test to evaluate the long-term performance and reliability of the structure while ensuring it is ready for future flood events. (U.S. Army video by Delanie Stafford)
| Date Taken: | 06.24.2026 |
| Date Posted: | 07.22.2026 13:28 |
| Category: | B-Roll |
| Video ID: | 1015702 |
| VIRIN: | 260624-A-KS317-2003 |
| Filename: | DOD_111855631 |
| Length: | 00:11:32 |
| Location: | US |
| Downloads: | 0 |
| High-Res. Downloads: | 0 |
This work, Spillway flow test conducted for Garrison Dam Safety Modification Project, by Delanie Stafford, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.