(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Navy begins removing pipeline from Red Hill facility

    Advanced Embed Example

    Add the following CSS to the header block of your HTML document.

    Then add the mark-up below to the body block of the same document.

    June 2026: Navy Closure Task Force-Red Hill contractors use a material transport train to remove pipeline from the Red Hill Bulk Fuel Storage Facility and move it to a shipping container outside Adit 2.

    VIDEO INFO

    Date Taken: 06.01.2026
    Date Posted: 07.21.2026 15:14
    Category: B-Roll
    Video ID: 1015473
    VIRIN: 260602-N-IS471-7559
    Filename: DOD_111852187
    Length: 00:00:48
    Location: HAWAII, US

    Video Analytics


    Downloads: 2
    High-Res. Downloads: 2

    PUBLIC DOMAIN