Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo
    Tag: runway test
    Type: image
    • Runway construction prompts arresting system upgrade

      Photo by Staff Sgt. Duane Duimstra   |   114th Fighter Wing   |   10.17.2017

      175th Fighter Squadron F-16s grabs the BAK-14M hook cable support system with its arresting hook during the system certification Oct. 17, 2017, Joe Foss Field, S.D. The system maintains the fully operational status of military hook cable aircraft arresting systems installed on active runways at military-commercial joint-use airfields, while providing unobstructed runway surface for commercial......

    • Runway construction prompts arresting system upgrade

      Photo by Staff Sgt. Duane Duimstra   |   114th Fighter Wing   |   06.17.2015

      114th Civil Engineer power production Airmen and construction workers prepare the runway for the installation of the new Zodiac Arresting Systems BAK-14M retractable hook cable support system at Joe Foss Field, Sept. 15, 2017. The system maintains the fully operational status of military hook cable aircraft arresting systems installed on active runways at military-commercial joint-use......