Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo
    Tag: Asphalt Batch Plant
    Type: image
    • Asphalt Batch Plant Project

      Photo by Petty Officer 2nd Class lilah HudsonKindred   |   Naval Mobile Construction Battalion 4   |   04.15.2021

      210415-N-ZE595-1004 SANTA RITA, Guam (April 15, 2021) Equipment Operator 3rd Class Austin Bird, assigned to Naval Mobile Construction Battalion (NMCB) 4, operates a front-end loader to load gravel into the mobile asphalt batch plant to create asphalt for various construction projects. NMCB-4 is forward-deployed throughout the Indo-Pacific region ready to support major combat operations,......

    • Asphalt Batch Plant

      Photo by Petty Officer 2nd Class lilah HudsonKindred   |   Naval Mobile Construction Battalion 4   |   02.10.2021

      210210-N-ZE595-1002 SANTA RITA, Guam (Feb. 10, 2021) Utilitiesman 3rd Class Christian Kinney, assigned to Naval Mobile Construction Battalion (NMCB) 4, grinds off rust at the batch plant project to ensure equipment is in operational condition while in use. NMCB 4 is forward-deployed throughout the Indo-Pacific region, ready to support major combat operations, humanitarian assistance, and......

    • Forklift for Asphalt Batch Plant

      Photo by Petty Officer 2nd Class lilah HudsonKindred   |   Naval Mobile Construction Battalion 4   |   02.10.2021

      210210-N-ZE595-1003 SANTA RITA, Guam (Feb. 10, 2021) Equipment Operator 3rd Class Levi Longley, assigned to Naval Mobile Construction Battalion (NMCB) 4, uses the 11K telehandler forklift to move material for the Asphalt Batch Plant. NMCB 4 is forward-deployed throughout the Indo-Pacific region, ready to support major combat operations, humanitarian assistance, and disaster relief and provide......

    • Asphalt Batch Plant Project

      Photo by Petty Officer 2nd Class lilah HudsonKindred   |   Naval Mobile Construction Battalion 4   |   02.10.2021

      210210-N-ZE595-1004 SANTA RITA, Guam (Feb. 10, 2021) Construction Mechanic 3rd Class Alan Sargent, assigned to Naval Mobile Construction Battalion (NMCB) 4, paints the Asphalt Batch Plant project's sign. NMCB 4 is forward-deployed throughout the Indo-Pacific region, ready to support major combat operations, humanitarian assistance, and disaster relief and provide general engineering and civil......

    • Commander NECC Visits NCF in Guam

      Photo by Chief Petty Officer Matthew White   |   30th Naval Construction Regiment   |   12.05.2019

      191205-N-WR252-2022 SANTA RITA, Guam (Dec. 5, 2019) Equipment Operator 1st Class David Earley, assigned to Naval Mobile Construction Battalion (NMCB) 5, gives a status brief of the asphalt batch plant to Rear Arm. Brian Brakke, Commander, Navy Expeditionary Combat Command, during his tour of Naval Construction Force activities on board Naval Base Guam. (U.S. Navy photo by Chief Mass......

    • Commander NECC Visits NCF in Guam

      Photo by Chief Petty Officer Matthew White   |   30th Naval Construction Regiment   |   12.05.2019

      191205-N-WR252-2009 SANTA RITA, Guam (Dec. 5, 2019) Equipment Operator 1st Class David Earley, assigned to Naval Mobile Construction Battalion (NMCB) 5, gives a status brief of the asphalt batch plant to Rear Arm. Brian Brakke, Commander, Navy Expeditionary Combat Command, during his tour of Naval Construction Force activities on board Naval Base Guam. (U.S. Navy photo by Chief Mass......