STANDARD OPERATING PROCEDURE FOR GENERAL GUIDANCE ON POLES AND PENETRATIONS IN OR NEAR (WITHIN 15 FT OF LEVEE TOE) LEVEE EMBANKMENTS OR NEAR (WITHIN 8 FT OF BASE OF FLOODWALL) FLOODWALLS
| Published: | July 5, 2024 |
U.S. Army Corps of Engineers, Louisville District - Draft Documents