Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    PUBLIC NOTICE OF TRAINING AND ROAD CLOSURES AT CAMP SHELBY

    CAMP SHELBY, Miss. – The Camp Shelby Joint Forces Training Center will conduct training at its air to ground range through the end of December.
    Several gate closures and temporary barricades should be expected throughout the range complex and training areas during this time. These areas are off-limits to the public and civilians are not allowed to cross any closed gates or temporary barricades.
    Over the next few months, military units may also conduct driving operations at night without headlights. The public is advised to proceed with caution throughout Camp Shelby’s training areas and be aware of these maneuvers as well as traffic control points.
    The bridge on the South Tank Trail near training range 18 is scheduled to be under construction until around December 31, 2017. The public should be prepared to take detoured routes during this time period.
    Please see the attached list of specific dates and roads affected by this training for more details. Additional information regarding this training and road closures can be obtained from the Camp Shelby range control office at (601) 558-2709.
    -30-

    LIST OF ROAD CLOSURES

    1-5 December:
    The Forest Service roads affected during this time are: 304/Davis Range Road, 305I, 305K, 305K1, 311, 311B, 367C, 369B, 369D.

    3-8 December, 11-15 December:
    The Forest Service Roads affected during this time are: 312B, Dewey Road, and the Access Road to Oil Well USA 21-4.

    7-10 December:
    The Forest Service Roads affected during this time are: 305I, 305K, 305K1, 367, 367C, 311, 311B.

    7-11 December, 14-18 December:
    The Forest Service roads affected during this time are: 304/Davis Range road, 305I, 305K, 305K1, 311, 311A1, 311B, 367C, 369, 369A, 369B, 369B1, 369D, and 369E.

    1-31 December
    The bridge on the South Tank Trail near range 18 will be under construction until around 31 December.

    LEAVE A COMMENT

    NEWS INFO

    Date Taken: 11.30.2017
    Date Posted: 12.29.2017 16:51
    Story ID: 260861
    Location: MS, US

    Web Views: 40
    Downloads: 0

    PUBLIC DOMAIN