Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Laying the pre-foundation

    SAVANNAH, GA, UNITED STATES

    05.06.2016

    Story by Jeremy Buddemeier  

    U.S. Army Corps of Engineers, Savannah District

    SAVANNAH, Ga. -- Construction continued on the dissolved oxygen injection system at two sites along the Savannah River last week. This time-lapse video shows workers installing a cofferdam as part of what will become the foundation for a series of Speece cones.

    The cones, which are part of the dissolved oxygen system, will super-oxygenate river water and inject it back into the Savannah River to maintain current levels of dissolved oxygen as the shipping channel is deepened.

    The U.S. Army Corps of Engineers, Savannah District, oversees the SHEP, including environmental mitigation, like the dissolved oxygen system. CDM Constructors is the prime contractor for the dissolved oxygen injection system installation.

    LEAVE A COMMENT

    NEWS INFO

    Date Taken: 05.06.2016
    Date Posted: 05.06.2016 15:32
    Story ID: 197559
    Location: SAVANNAH, GA, US

    Web Views: 31
    Downloads: 0

    PUBLIC DOMAIN