This photo shows a track mounted drill rig used to install an injection well on May 3, 2025. These wells are instrumental in this clean-up project.
| Date Taken: | 09.02.2026 |
| Date Posted: | 09.02.2026 13:42 |
| Photo ID: | 9906590 |
| VIRIN: | 260902-A-EC870-9409 |
| Resolution: | 648x862 |
| Size: | 281.62 KB |
| Location: | US |
| Web Views: | 4 |
| Downloads: | 0 |
This work, Contractor Operates Drill Rig During Ground Investigation at Military Installation, by CPT Tyrese Lane, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.