Soldiers and guests of the 3D‑printed barracks ribbon‑cutting ceremony tour the newly constructed facility at Fort Bliss, Texas, July 28, 2026. The 1st Armored Division, the U.S. Army Corps of Engineers and ICON presented the first of ten 3D‑printed barracks designed to house up to 560 service members, modernize Army infrastructure and deliver energy‑resilient, high‑quality facilities at a fraction of the time and cost of traditional construction. (U.S. Army photo by Spc. Garret Kimmel)
| Date Taken: | 07.28.2026 |
| Date Posted: | 07.29.2026 15:40 |
| Photo ID: | 9836496 |
| VIRIN: | 260728-A-TI268-4619 |
| Resolution: | 1774x998 |
| Size: | 517.84 KB |
| Location: | TEXAS, US |
| Web Views: | 4 |
| Downloads: | 0 |
This work, Fort Bliss 3D barracks ribbon cutting ceremony, by SPC Garret Kimmel, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.