A 12 MW natural gas powered microgrid at Fort Campbell, Kentucky ensures the garrison sustains essential functions when the commercial power grid goes down. The microgrid is scheduled to be turned over to Fort Campbell, December 2025. (U.S. Army Corps of Engineers photo by Charles Delano)
Date Taken: | 09.12.2025 |
Date Posted: | 09.24.2025 15:06 |
Photo ID: | 9337489 |
VIRIN: | 250912-A-PA223-1020 |
Resolution: | 2048x1365 |
Size: | 2.1 MB |
Location: | FORT CAMPBELL, KENTUCKY, US |
Web Views: | 10 |
Downloads: | 1 |
This work, Fort Campbell microgrid keeps garrison ready, by Charles Delano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.