Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Army engineers use their brute strength to push a partially constructed bridge into position

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Army engineers use their brute strength to push a partially constructed bridge into position

    (UNDISCLOSED LOCATION)

    09.27.1998

    Courtesy Photo

    Defense.gov         

    Army engineers use their brute strength to push a partially constructed Mabey and Johnson bridge into position at Camp Demi near Kladanj, Bosnia and Herzegovina, on Sept. 28, 1998. The flooding Drinjaca river damaged the supports of the present bridge leading to the American army compound which was forced to close the gate used for multi-ton vehicle traffic. The construction of the bridge is a combined effort between the U.S. Army's Alpha Company, 40th Engineers 1st Platoon of Idar Oberstein, Germany; Alpha Company 20th Engineers 2nd Platoon, of Fort Hood, Texas; Brown and Root civilian contractors and Romanian Army Engineers. The engineers are deployed to Bosnia and Herzegovina to support Operation Joint Forge.

    (DoD photo by Staff Sgt. Lisa Zunzanyika-Carpenter, U.S. Air Force. (Released))

    IMAGE INFO

    Date Taken: 09.27.1998
    Date Posted: 07.27.2025 12:00
    Photo ID: 9208693
    VIRIN: 980928-D-D0439-4679
    Resolution: 1268x1012
    Size: 565.09 KB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 10
    Downloads: 1

    PUBLIC DOMAIN