When air conditioning failed at the ROC—the nerve center of Fort Hood’s range training operations— during late June’s triple digit temperatures surge, Huntsville Center quick developed a contract ensuring mobile air conditioning units were deployed to cool conditions inside the facility and preventing delays in range operations.
Date Taken: | 06.25.2025 |
Date Posted: | 07.23.2025 17:11 |
Photo ID: | 9199292 |
VIRIN: | 250723-A-QY194-1002 |
Resolution: | 1824x1397 |
Size: | 1.25 MB |
Location: | ALABAMA, US |
Web Views: | 6 |
Downloads: | 1 |
This work, Swift action by Huntsville Center keeps Fort Hood range control mission-ready despite A/C failure, by William Farrow, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.