Merchant tanker Empire State receives fuel during the sixth transfer of fuel from the Red Hill Bulk Fuel Storage Facility (RHBFSF) Nov. 6, 2023, at Joint Base Pearl Harbor-Hickam, Hawaii, as merchant tanker Stena Imperative awaits the next transfer. Joint Task Force-Red Hill (JTF-RH) is in the fifth and final phase of its defueling plan, where JTF-RH along with Defense Logistics Agency Energy and Fleet Logistics Center Pearl Harbor, are safely defueling the RHBFSF. This stage consists of defueling approximately 104 million gallons of fuel, with planned strategic pauses for safety checks, and transporting the fuel to various locations throughout the Pacific. JTF-RH continues to work in collaboration with state and federal regulators to ensure proper oversight throughout the defueling process (DoD photo by U.S. Army Maj. Jonathon M. Lewis)
Date Taken: | 11.06.2023 |
Date Posted: | 11.06.2023 19:29 |
Photo ID: | 8110345 |
VIRIN: | 231106-A-MM617-1003 |
Resolution: | 3464x2309 |
Size: | 2.16 MB |
Location: | JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US |
Web Views: | 79 |
Downloads: | 5 |
This work, JTF-RH Initiates Sixth Fuel Transfer from Red Hill Bulk Fuel Storage Facility, by MAJ Jonathon Lewis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.