Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Endeavor STS-113 Mission Launch

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Endeavor STS-113 Mission Launch

    WASHINGTON, DISTRICT OF COLUMBIA, UNITED STATES

    11.19.2009

    Courtesy Photo

    NASA

    The 16th American assembly flight and 112th overall American flight to the International Space Station (ISS) launched on November 23, 2002 from Kennedy's launch pad 39A aboard the Space Shuttle Orbiter Endeavor STS-113. Mission objectives included the delivery of the Expedition Six Crew to the ISS, the return of Expedition Five crew back to Earth, and the installation and activation of the Port 1 Integrated Truss Assembly (P1). The first major component installed on the left side of the Station, the P1 truss provides an additional three External Thermal Control System radiators. Weighing in at 27,506 pounds, the P1 truss is 45 feet (13.7 meters) long, 15 feet (4.6 meters) wide, and 13 feet (4 meters) high. Three space walks, aided by the use of the Robotic Manipulator Systems of both the Shuttle and the Station, were performed in the installation of P1.

    NASA Identifier: MSFC-0300049

    IMAGE INFO

    Date Taken: 11.19.2009
    Date Posted: 10.19.2012 16:50
    Photo ID: 755616
    Resolution: 1536x1536
    Size: 157.81 KB
    Location: WASHINGTON, DISTRICT OF COLUMBIA, US

    Web Views: 93
    Downloads: 7

    PUBLIC DOMAIN