(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    F-18 HARV smoke and tuft vortex flow visualization along leading edge extension

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    F-18 HARV smoke and tuft vortex flow visualization along leading edge extension

    WASHINGTON, DISTRICT OF COLUMBIA, UNITED STATES

    09.23.2009

    Courtesy Photo

    NASA

    Flow visualization smoke marks vortex flows along the leading edge extension on an F/A-18 flown by NASA's Dryden Flight Research Center, Edwards, California, in its High Alpha Research Vehicle (HARV) program. The aircraft is at a high angle of attack in this photo. The aircraft was modified with a thrust vectoring system to further investigate high angle of attack flying. The program was conducted jointly with NASA's Langley Research Center.

    NASA Identifier: NIX-EC89-0096-149

    IMAGE INFO

    Date Taken: 09.23.2009
    Date Posted: 10.18.2012 03:42
    Photo ID: 742687
    Resolution: 1536x1321
    Size: 307.3 KB
    Location: WASHINGTON, DISTRICT OF COLUMBIA, US

    Web Views: 113
    Downloads: 11

    PUBLIC DOMAIN