Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
7 x 10-Foot High Speed Tunnel
Strain gauge balance installation in the 7 x 10-Foot High Speed Tunnel (top cover of model fuselage is removed).
NASA Identifier: L62265
Date Taken: |
09.23.2009 |
Date Posted: |
10.10.2012 17:15 |
Photo ID: |
712462 |
Resolution: |
1536x1070 |
Size: |
176.25 KB |
Location: |
WASHINGTON, DC, US |
Web Views: |
9 |
Downloads: |
0 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS
LEAVE A COMMENT