Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Italian aerospace company Alenia prepare TSS-1R in O&C

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Italian aerospace company Alenia prepare TSS-1R in O&C

    WASHINGTON, DISTRICT OF COLUMBIA, UNITED STATES

    09.23.2009

    Courtesy Photo

    NASA

    Employees of the Italian aerospace company Alenia Spazio S.p.A. prepare the Tethered Satellite System-1R (TSS-1R) that is one of two primary payloads scheduled to fly aboard the Orbiter Columbia during the STS-75 mission in early 1996 for a series of tests in the Operations and Checkout (O&C) Building. The TSS program is a joint venture between NASA and the Agenzia Spaziale Italiana, or Italian Space Agency. The "R" designation indicates a reflight. The TSS-1 flew aboard Atlantis during the STS-46 mission in July 1992 and achieved only a partial success when its tether reel mechanism became jammed after only approximately 840 feet of the 12-mile-long tether had been unwound as the satellite rose from its cradle in the orbiter's payload bay. Once deployed to the 12- mile height on the STS-75 mission, the satellite will be used to validate theories that such a system could possibly be used in the future to generate electrical power to power orbital systems, raise and lower spacecraft, study atmospheric conditions at several different heights and for many other applications.

    NASA Identifier: NIX-KSC-95PC-0979

    IMAGE INFO

    Date Taken: 09.23.2009
    Date Posted: 10.10.2012 13:32
    Photo ID: 695490
    Resolution: 1536x1034
    Size: 176.3 KB
    Location: WASHINGTON, DISTRICT OF COLUMBIA, US

    Web Views: 18
    Downloads: 1

    PUBLIC DOMAIN