USS Toledo (SSN 769) is the next submarine overhaul at Norfolk Naval Shipyard (NNSY) to implement NSS-SY improvements. Toledo has been undergoing an extensive Engineered Overhaul since arriving at NNSY in Jan. 2021. Leveraging NSS-SY initiatives comes at an important time as the project team shifted to the more extensive maintenance once the boat entered dry dock in May.
| Date Taken: | 05.01.2021 |
| Date Posted: | 08.18.2021 06:59 |
| Photo ID: | 6787484 |
| VIRIN: | 210501-N-YO710-002 |
| Resolution: | 5067x3378 |
| Size: | 4.98 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 69 |
| Downloads: | 8 |
This work, USS Toledo’s Engineered Overhaul at NNSY implements NSS-SY improvements, by Shelby West, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.