Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Dorm 214 demolition begins [Image 1 of 2]

    Dorm 214 demolition begins

    RAF MILDENHALL, UNITED KINGDOM

    08.17.2012

    Photo by Senior Airman Rachel Waller 

    100th Air Refueling Wing   

    Neil Drike, a contractor, sprays Dorm 214 with water as Rob Saunvers, JCB Tracked Excavator JS220 Long Reach operator and contractor, demolishes the building Aug. 17, 2012, at RAF Mildenhall. The dorm demolishment project is scheduled to be completed by the end of September 2012 and is expected to cost $389,000.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 08.17.2012
    Date Posted: 08.20.2012 05:38
    Photo ID: 648413
    VIRIN: 120817-F-BX362-060
    Resolution: 4151x2659
    Size: 3.66 MB
    Location: RAF MILDENHALL, GB

    Web Views: 7
    Downloads: 1

    PUBLIC DOMAIN