Fort Campbell now has a new 2.4-mile trail on post to give those on the north end of the installation a place to run, bike or walk. The project was paid for through the Qualified Recycling Program that sells recyclables collected on post to pay for quality of life improvements on the installation. (Fort Campbell Directorate of Public Works, U.S. Army, released)
Date Taken: | 07.15.2020 |
Date Posted: | 07.30.2020 16:57 |
Photo ID: | 6291637 |
VIRIN: | 200730-A-N1234-005 |
Resolution: | 2016x1134 |
Size: | 1.25 MB |
Location: | FORT CAMPBELL, KENTUCKY, US |
Web Views: | 8 |
Downloads: | 5 |
This work, New trail on north end of installation built with recycling funds, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.