Richard P. Boyd, an electrical equipment repairer at Fleet Readiness Center East, works on the motor for an H-53 tail skid actuator. FRCE aircraft maintenance professionals and engineers worked together to develop technical instructions for repairing the motor, which previously would be scrapped and replaced with a new component if it stopped functioning. This new procedure allowed FRCE’s Components Branch to produce, test and certify enough motors to reduce the backlog that built up while waiting on new motors from the vendor.
Date Taken: | 03.04.2020 |
Date Posted: | 03.11.2020 11:51 |
Photo ID: | 6134101 |
VIRIN: | 200304-N-YO303-002 |
Resolution: | 4288x2848 |
Size: | 5.02 MB |
Location: | CHERRY POINT, NC, US |
Web Views: | 11 |
Downloads: | 3 |
This work, Teamwork, ingenuity and hard work help FRCE overcome production challenges, by John Olmstead, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT