Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Teamwork, ingenuity and hard work help FRCE overcome production challenges

    Teamwork, ingenuity and hard work help FRCE overcome production challenges

    CHERRY POINT, NC, UNITED STATES

    03.04.2020

    Photo by John Olmstead 

    Fleet Readiness Center East

    Richard P. Boyd, an electrical equipment repairer at Fleet Readiness Center East, works on the motor for an H-53 tail skid actuator. FRCE aircraft maintenance professionals and engineers worked together to develop technical instructions for repairing the motor, which previously would be scrapped and replaced with a new component if it stopped functioning. This new procedure allowed FRCE’s Components Branch to produce, test and certify enough motors to reduce the backlog that built up while waiting on new motors from the vendor.

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 03.04.2020
    Date Posted: 03.11.2020 11:51
    Photo ID: 6134101
    VIRIN: 200304-N-YO303-002
    Resolution: 4288x2848
    Size: 5.02 MB
    Location: CHERRY POINT, NC, US

    Web Views: 11
    Downloads: 3

    PUBLIC DOMAIN